Operation Checklist - GE CHP9530 Manuel Du Propriétaire

Masquer les pouces Voir aussi pour CHP9530:
Table des Matières

Publicité

CHECKLISTS
1 PRE-TEST CHECKLIST
A
B
C
D
Installation Instructions
8

2 OPERATION CHECKLIST

A
B
C
D
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are
UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than
the temperature rating of household wiring.
The current carrying capacity of a conductor
is governed by the wire gauge and also the
temperature rating of the insulation around
the wire.
NOTE: ALUMINUM WIRING
• WARNING:
IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.
• Splice copper wires to aluminum wiring
using special connectors designed and UL
approved for joining copper to aluminum
and follow the manufacturer's recommended
connector procedure closely.
NOTE: Wire used, location and enclosure of
splices, etc., must conform to good wiring
practice and local codes.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Chp9536

Table des Matières