Operation Checklist - GE PGP976 Instructions D'installation

Table de cuisson scellée au gaz de 91.4 cm (36”)
Masquer les pouces Voir aussi pour PGP976:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION CHECKLIST

Make sure all controls are left in the OFF
A
position. Check to be sure the cooktop is in the
UNLOCKED position (on models so equipped).
Make sure the flow of air to and from the
B
cooktop is unobstructed.
The serial plate for your cooktop is located on
C
the bottom of the burner box. In addition to the
model and serial numbers, it tells you the ratings
of the burners and the type of fuel and pressure
the cooktop was adjusted for when it left the
factory.
Installation Instructions
11
When ordering parts, always include the serial
D
number, model number and a code letter to
ensure proper replacement parts.
Recheck Steps:
E
Double check to make sure everything in this
guide has been completed. Rechecking steps
will ensure safe use of the cooktop.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pgp986Cgp650

Table des Matières