Maintenance; Asafety Instructions; Bmaintenance Plan; Daily Maintenance - Cassese MACH 1CART Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

USER MANUAL

5 MAINTENANCE

5.A
SAFETY INSTRUCTIONS
The MACH 1 CART is using two types of power sources: electric and pneumatic. It is essential for your safety
to make sure that both of them are disconnected prior to make any maintenance. Please refer to instructions
below prior to perform any maintenance.
Unplug the machine
from the electrical
supply
If using compressed air to clean some parts, wear safety glasses. It is even recommended to use a vacuum to
5.B
MAINTENANCE PLAN
5.B.a

Daily maintenance:

It is recommended once a day to clean the table surface with a clean cloth and make sure there is no debris in the distributor
head. If some glue is remaining in the distribution block, then perform procedure 5.C REMOVING THE DISTRIBUTOR HEAD (page
22) and 5.D LUBRICATING THE DISTRIBUTOR HEAD (page 23). It is important to avoid glue from drying in the distribution head
as it could prevent the cartridge from going in the distribution block correctly.
5.B.b

Regular maintenance:

Every 50 000 inserted wedges, the machine will ask for a maintenance a warning screen will come up asking you to lubricate the
distribution head. Refer to following chapter to perform this maintenance:
5.A
SAFETY INSTRUCTIONS
5.C REMOVING THE DISTRIBUTOR HEAD (page 22)
5.D LUBRICATING THE DISTRIBUTOR HEAD (page 23)
5.F RESETTING THE MAINTENANCE ALARM (page 24)
Figure 5-2
clean the machine rather than compressed air that will spray dust everywhere.
All maintenance and control operations must be carried out by skilled maintenance staff.
(page: 21)
Rotate red button in
EXH position.
Unplug the machine
from
pneumatic
source.
Install a locker to
ensure nobody will
turn back on the
machine while you
will be performing
the maintenance.
MACH 1 CART
Figure 5-1
21

Publicité

Table des Matières
loading

Table des Matières