Gree GUD35P/A-T Manuel D'utilisateur page 35

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(2). If the outdoor unit is above the indoor unit, arrange the pipeline according to the
following diagram.
1) Wind the insulating tape from bottom to top.
2) The whole pipeline should be wound together to avoid water returning to
the room.
3) Use saddles to fix the whole pipeline onto the wall.
3.2.6.3 Drainage Riser with Pump Unit Considerations
(1) For the unit with the condensate pump, only one drain port at the side close to
the electric box is prepared and only through it the drain hose can be
connected.
Model
GUD35P/A-T, GUD35PS/A-T
GUD50P/A-T, GUD50PS/A-T
GUD71P/A-T, GUD71PS/A-T
GUD85P/A-T, GUD85PS/A-T
GUD100PH/A-T, GUD100PHS/A-T
GUD125PH/A-T, GUD125PHS/A-T
GUD140PH/A-T, GUD140PHS/A-T
GUD160PH/A-T, GUD160PHS/A-T
(2) For the unit with the condensate pump, two drain ports at the bottom are
defaulted to be factory plugged with drain caps. After the installation of the drain
hose, these two drain ports also need to be insulated properly with the same
way aforementioned.
(3) The lifted installation height of drainage pipe is less than 1,000mm, as is shown
in the following figure.
DC Inverter U-match Series Duct Type Unit
Item
(outer dimension x wall thickness)(mm)
31
Drain pipe
Ф26×1.5

Publicité

Table des Matières
loading

Table des Matières