5 Check Items after Installation and Trial Run

5.1 Check Items after Installation

Check Items
Has the unit been fixed firmly?
Have you done the gas leakage test?
Is the unit get proper thermal insulation?
Does the unit drain well?
Is the voltage in accordance with the rated voltage
specified on the nameplate?
Is the electric wiring and piping connection
installed correctly and securely?
Has the unit been earthed securely?
Is the power cord specified?
Has the inlet and outlet been blocked?
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Fig. 4.8.2
Conditions Might Happen
The unit may drop, shake or emit noise.
It may cause insufficient cooling/heating
capacity.
It may cause condensation and dripping.
It may cause condensation and dripping.
It may cause malfunction or damage the part.
It may cause malfunction or damage the part.
It may cause electrical leakage.
It may cause malfunction or damage the part.
It may cause insufficient cooling/heating
capacity.
48