Kohler K-11344 Guide D'installation Et D'entretien page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Prepare the Site (cont.)
Ensure the subfloor is level.
Determine the location of the bath. Provide a minimum clearance of 24" (610 mm) around the
perimeter of the bath. Additional space is recommended to ease installation.
Use the cut-out template provided with the bath to properly mark the water supply and drain
locations in relation to the chosen location of the bath.
Install an access panel to service the remote blower motor.
Prepare the routing paths for 1-1/2" PVC piping and a keypad cable to run under the floor from the
blower to the bath. Follow all applicable building, fire, plumbing, and electrical codes.
Determine the location on the floor where the PVC piping from the blower will exit from under the
floor to connect to the bath piping. Mark this location on the floor.
Cut the marked water supply and drain locations in the subfloor with a saw and hole saw.
Cut the hole for the blower PVC piping and keypad cable at the marked location on the floor.
Install the rough water supply and drain lines.
Install the finished flooring material prior to installing the bath.
Ensure the finished floor is level before proceeding with the bath installation.
Kohler Co.
5
1220597-2-D

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-14037

Table des Matières