Instrument Table; Mounting The Roller Rails/Slide Plate - Haag-Streit LENSTAR LS 900 Mode D'emploi

Biomètre olcr (optique de faible cohérence reflectométrique)
Masquer les pouces Voir aussi pour LENSTAR LS 900:
Table des Matières

Publicité

 INSTALLATION
3.1 Safe system configuration according to IEC / EN 60601-1
BEWARE
All externally connected devices must meet the
relevant safety standards.
26 Power supply (LS 900
)
®

27 Instrument Table

28 Isolation Transformer
29 Laptop / PC
30 Power supply (PC)
31 Printer
. Instrument table
The instrument table is delivered in a separate package. To assemble
table, please use instructions enclosed with it.

3.2.1 Mounting the roller rails/slide plate

The roller rails/slide plate must be positioned in such a way that, when
the device is centred, the patient's eye will be at a distance of 68mm
from the front of the device.
32 Rail
33 Positionning sticker
34 Gliding plate
35 Headrest columns
36 Aperture for cables
.. Mounting the sticker for automatic position recognition
• Take off rail cover and move the device to the side, if already
in position.
• Clean surface of table.
• Remove protective film (Figure 37) from back of sticker. Start lifting
it off carefully from the corner opposite the white area .
• Position the sticker with the white side against the right roller
rail (38) and the edge of the table (Figure 39). Press the black/white
area down firmly and stroke out any air bubbles.
• Carefully tear off the rest of the sticker (Positionierungswerkzeug/
Positioning Tool) along perforations (Figure 40).
1500.7220055.04030
200
© Haag-Streit AG, CH-3098 Koeniz, Switzerland
LAN
9
9

Publicité

Table des Matières
loading

Table des Matières