Safran MULTI MISSION SYSTEM 420 Manuel D'utilisation Et D'entretien page 8

Table des Matières

Publicité

PARACHUTE & PROTECTION
3.3.5.
Version E1 (Fig.25)
3.3.6.
3.3.7.
5.
5.1.
5.2.
Installation de la poignée secours Reserve ripcord setting ............................................... 33
5.3.
5.4.
5.5.
5.5.1.
5.5.2.
5.5.3.
5.6.
5.6.1.
5.6.2.
Installation de la FXC
5.7.
5.8.
5.9.
5.9.1.
5.9.2.
5.10.
5.10.1.
5.10.2.
5.10.3.
5.11.
5.11.1.
5.11.2.
5.12.
5.12.1.
5.12.2.
5.13.
Fermeture du conteneur secours Reserve container closing .......................................... 123
5.13.1.
5.13.2.
5.13.3.
Cheminement des bouclettes de fermeture Routing of locking loops.................................................. 134
5.13.4.
CE DOCUMENT EST LA PROPRIETE DE LA SOCIETE SAFRAN ELECTRONICS AND DEFENSE IL NE PEUT ETRE NI REPRODUIT NI COMMUNIQUE SANS L'AUTORISATION DE
THIS DOCUMENT IS SAFRAN ELECTRONICS AND DEFENSE PROPRIETY.IT CANNOT BE REPRODUCED NOR COMMUNICATED WITHOUT ITS WRITTEN AUTHORIZATION.
CMM 25-63-99
MANUEL D'UTILISATION ET D'ENTRETIEN SMM 420 TYPE 740-2
CMM 25-63-99
COMPONENTS MAINTAIN AND USER MANUAL MMS 420 TYPE 740-2
E1 Version (Fig.25) ............................................................................. 28
E2 Version (Fig.26) ............................................................................. 29
F Version (Fig.27)................................................................................. 30
Reserve Container ............................................................... 31
Processing unit fitting ............................................................................ 44
Arming the FXC Model .......................................................................... 45
FXC Model setting ................................................................................... 46
SAFRAN ELECTRONICS AND DEFENSE
Reserve window fitting ............................................... 32
LOR II system setting .................................................... 36
AAD fitting ................................................................... 37
Cutter fitting ............................................................................ 38
Unit control fitting .................................................................. 40
Dorsal padding location .......................................................... 41
Shoulder padding extension location ...................................... 42
FXC (EL 037) fitting ....................................................... 45
Reserve deployment bag for BT80RV12 ....................... 49
Reserve closing loop .................................................... 51
Reserve closing loop adjustement ............................................ 51
Reserve closing loop fitting ...................................................... 54
Reserve canopy fitting ................................................ 55
Rigging lines fitting ........................................... 55
Reserve steering lines fitting ............................ 56
Reserve canopy assembly control ..................... 58
BT80R V15 Reserve canopy packing .............................. 59
Fuse setting ............................................................................... 60
Braking the steering line ........................................................... 63
Reserve canopy hanging preparation ....................................... 66
Reserve canopy folding ............................................................. 70
Reserve deployment bag stowing ............................................. 79
BT80R V12 Reserve canopy packing .............................. 86
Braking the steering line .......................................................... 87
Reserve canopy hanging preparation ....................................... 90
Reserve canopy folding ............................................................. 94
Reserve deployment bag stowing ........................................... 103
Flat Packing ............................................................................. 110
Reserve canopy hanging preparation ...................................... 110
Reserve deployment bag stowing ............................................ 115
AAD closing ..................................................................... 130
FXC closing ..................................................................... 132
Upper reserve flap closing .............................................. 135
ED 15
12/2020
ED15
12/2020

Publicité

Table des Matières
loading

Produits Connexes pour Safran MULTI MISSION SYSTEM 420

Ce manuel est également adapté pour:

740-2

Table des Matières