PARACHUTE & PROTECTION
Mise en POD et Lovage
Replier la voilure principale afin de lui donner
la largeur du POD principal.(Fig. 860)
Réaliser un premier S au niveau du warning.
(Fig.861)
CE DOCUMENT EST LA PROPRIETE DE LA SOCIETE SAFRAN ELECTRONICS AND DEFENSE IL NE PEUT ETRE NI REPRODUIT NI COMMUNIQUE SANS L'AUTORISATION DE
THIS DOCUMENT IS SAFRAN ELECTRONICS AND DEFENSE PROPRIETY.IT CANNOT BE REPRODUCED NOR COMMUNICATED WITHOUT ITS WRITTEN AUTHORIZATION.
CMM 25-63-99
MANUEL D'UTILISATION ET D'ENTRETIEN SMM 420 TYPE 740-2
CMM 25-63-99
COMPONENTS MAINTAIN AND USER MANUAL MMS 420 TYPE 740-2
SAFRAN ELECTRONICS AND DEFENSE
Main canopy into the main bag and stowing
Back fold the previous main canopy prepared to
match the width of the main deployment bag.
(Fig.860)
Fig. 860
Make a S-fold at the warning panel level.(Fig.861)
Fig. 861
370
ED 15
11/2020
ED 15
11/2020