Installation and Operation Instructions
CHAPTER 6

INSTALLATION

MiniVent M1/150 N / C
All subsequent information and instructions are intended solely for
authorised electricians!
6.0

Scope of delivery/Design

Leave the M1 delivery unit in its box until installation. Check that the fan is in good condition and has not been dama-
ged in transit.
fig.4
Å
ä
ù
ò
6.1

Preparation for wall installation (surface mounted)

The fan is delivered as a complete unit, i.e. ready for connection, as standard. The installation and start-up of the fan
should take place after the completion of all other works and after the final cleaning, in order to prevent damage and
contamination of the ventilation unit.
After the removal of packaging and the start of installation, the following points must be checked:
– is there any transport damage,
– broken or bent parts
– freewheeling of the impeller
6.2
Installation
The M1/150 N / C MiniVent is designed for direct wall installation. The housing must not be deformed or warped du
ring installation, and the flat structure of the installation surface must be ensured. The fans must only be installed on
sufficiently solid and stable subsurfaces with suitable fastening materials. Sufficient backflow must be ensured! If ap-
pli cable, observe instructions in DIN 1946-6.
1. Cable exit from the wall
- The location of the cable outlet varies in the dark area (fig.5).
- Distance to the duct centre depending on cable exit r = 83 mm with a variable position of 0 to 360°.
- For a simple assembly an exit is recommended as shown (turnable by 90° in each case).
The optimal position is 45° each if the cable exit is directly at the position of the cable grommet.
- Duct inside diameter M1/150 N / C = Ø 150 mm
- Distance to room corners: at least 130 mm from the duct centre
- With regard to surface mounted cabling, the side entry knockout for the cable (fig.8, Pos â) in the casing must be
broken out!
Scope of delivery:
ò Facia
ù Cover of control board
incl. 4x fastening screws
ä Control board
ë Plastic casing with impeller
ü
ö Guide vane removable at reduced installation depth
ö
ü Back draught shutter, removable
Å Cable grommet 2x
î Assembly kit
î
2x screws with plugs for wall mounting
ë
Ø Rubber foam strips
7
EN