Additional Information - Festo 8097522 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MPS
Industry 4.0 upgrade kit
®
Commissioning
2. Remove the connecting cable from the communication sensor:
– If the upstream station has no StationLink and the downstream station has StationLink, remove the
cable from the transmitter of the one-way light barrier on the left-hand side of the MPS
StationLink.
– If the upstream station has StationLink and the downstream station has no StationLink, remove the
cable from the receiver of the one-way light barrier on the right-hand side of the MPS
StationLink.
2.1
Connect the M8 plug of the connecting cable to the sensor cable of the MPS
that has become free and connect the safety connector of the connecting cable as shown in the
illustration into the safety plugs of the control panel of the MPS
2.2
Connect the M8 plug of the connecting cable to the sensor cable at the MPS
that has now become free and connect the safety connector of the connecting cable as shown in the
illustration into the safety plugs of the control panel of the MPS

11.4 Additional information

More information, current PLC programs for various controllers and technical documentation can be found
on the Internet at the following website:
www.ip.festo-didactic.com
62
Station with
®
®
Station with
tation with StationLink
®
®
Station without StationLink.
®
station with StationLink
Station without StationLink.
®
© Festo Didactic 8097301

Publicité

Table des Matières
loading

Table des Matières