Mounting The Handles; Mounting Panels To The Door And The Drawer - Fhiaba Integrated Serie Notice D'installation

Masquer les pouces Voir aussi pour Integrated Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.11 Mounting the handles

Handles will have to be mounted on the
panels before they are applied to the
fridge.
Operate as follows:
>
Drill two holes on the back of the panels accor-
ding to the table below
>
Depending on the style of panel, it may be ne-
cessary to create tapered countersinks for the
screw heads
1
>
Place the handle on top of the holes and insert
the screws through the washer, the panel, the
standoff and into the threaded receivers in the
handle
[ 2
].
>
Snug firmly but do not over tighten as damage
may occur to the handle or the panel
2
28
www.fhiaba.com · www.thevettagroup.com · Info Line 1-855-4-FHIABA (1-855-434-4222)
[ 1
].
HANDLE PRODUCT CODE
HV
Length
1104 mm
794 mm
(43 1/2")
(31 1/4")
A
Distance
900 mm
480 mm
between
(35 1/2")
(18 7/8")
fixing points X
899 / 36"
749 / 30"
Series
899 / 36"
599 / 24"
449 / 18"
5.12 Mounting panels to the door and
the drawer
Once all brackets and handles have been
applied to the panels, you can begin in-
stalling the bottom drawer.
Operate as follows:
>
Partially tighten the screw to the receiver
1
>
Hook the bottom drawer panel starting from the
adjustment bolts on the bottom
2
HO8
H07
H05
644 mm
494 mm
(25 3/8")
(19 5/8")
490 mm
340 mm
(19 1/4")
(13 3/8")
749 / 30"
599 / 24"
[ 1
[ 2
].
].

Publicité

Table des Matières
loading

Table des Matières