Interruption Of Work; Transportation (Fig. 21) - WAGNER WallPerfect Flexio 990 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WallPerfect Flexio 990
WallPerfect Flexio 990
"Cross spray" when using paint
i
with a poor covering capacity or if
the surface is highly absorbent (Fig.
20).
Interior wall paint in strong colour shades
should be applied at least twice (allow first
paint coat to dry first). This will ensure good
coverage.

18. Interruption of Work

Turn the machine off (position 0).
Depress the trigger to release pressure from
the system.
Leave the suction hose in the paint.
Wet paint surface in paint container with a
little water to prevent a skin from forming.
19.

Transportation (fig. 21)

Important. The bucket handle
must be between both fixtures.
Otherwise the bucket could
be tipped by the weight of the
PowerRoll system when being
transported and leak paint.
Attention! Do not pour any
liquids over the basic unit.
Once the device is attached to the paint bucket,
you can carry it easily together with the bucket.
Check that the device is securely attached to
the bucket before it is lifted by the handle.
Do not carry or pull the device by the hoses
to avoid any damage.
GB
D
45
45

Publicité

Table des Matières
loading

Table des Matières