Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
61 AF
High temperature Heat Pumps with integrated hydronic module
For the use of the control system, refer to the Pro-Dialog + control manual.
Contents
Start-up check list ........................................................................................................................................................................................ 1
Physical data and electrical data ............................................................................................................................................................ 2
Dimensions and location of connections (mm) ................................................................................................................................ 3
User interface and main switch .............................................................................................................................................................. 4
Minimum Clearances (mm) ...................................................................................................................................................................... 4
General information and hydronic module........................................................................................................................................ 5
Electrical connections and refrigerant charge .................................................................................................................................. 9
Start-up ..........................................................................................................................................................................................................10
Operating limits ..........................................................................................................................................................................................11
General maintenance, maintenance and final recommendations ..........................................................................................12
Troubleshooting .........................................................................................................................................................................................13
Start-up check list
_________________________________________________________________ Start up date _______________________________
Equipment sold by: ________________________________________________ Contract No: ________________________________
Installed by: ______________________________________________________ Contract No: ________________________________
Site address __________________________________________________________________________________________________
Equipment type and serial No: 61AF
ELECTRICAL DATA:
Supply voltage
Nominal voltage: ________________________________________ V
Current draw
Control circuit voltage: ____________________________________ V
Main circuit breaker rating ______________________________________________________________________________________
PHYSICAL DATA
Coil:
Entering air temp.: ___________________________°C
Leaving air temp.: ___________________________°C
SAFETY DEVICE SETTING:
High pressure switch: cut-out: _________________kPa
Oil level _____________________________________________________________________________________________________
OPTIONS:
Commissioning engineer (name) ________________________________________________________________________________
Customer agreement
Name: _____________________________________
Note: Complete this start-up list at the time of installation.
______________________________________________________________________
Ph 1: _______________V
Ph 1: _______________A
Ph 2: ______________ V
Ph 3: _______________ V
% network voltage ___________________________
Ph 2: ______________ A
Ph 3: ________________ A
Control circuit fuse _________________________ A
Plate heat exchanger:
Entering water temp.: ____________________ °C
Leaving water temp.: _____________________ °C
Pressure drop (water): ____________________ kPa
cut-in: ________________________kPa
Date: __________________________________
Page
GB - 1

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières