Hatco HCSBFR Série Manuel D'installation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
5. Carefully lower the hot/cold shelf into the countertop
cutout. This step requires two or more people.
• The hot/cold shelf shelf rests on top of the four leveling
bolts, which are part of the mounting bracket assembly
installed at each corner of the countertop cutout.
6. Adjust the leveling bolts underneath each corner of the unit
so that the shelf is flush or slightly below the countertop
surface.
7. Tighten the lock nut on each leveling bolt to secure the
position.
8. Apply a bead of National Sanitation Foundation (NSF)-
approved silicone sealant in the gap between the
countertop and the hot/cold shelf. To apply a clean,
consistent sealant bead:
a. Make sure the shelf is centered in the countertop cutout.
b. Install masking tape on each side of the gap to define
the edge of the sealant.
c. Carefully apply sealant into the gap.
d. Quickly smooth the sealant surface.
e. Carefully remove the masking tape before the sealant
dries.
NOTE: The silicone sealant must be rated for use at temperatures
between -10°F (-23°C) and 250°F (121°C).
9. Apply polyurethane-based foam sealant in the gap
underneath the countertop and the cold shelf.
Seal this gap with foam sealant
underneath the entire unit.
Foam Sealant Gap
DO NOT tip unit/mounting surface after final installation.
Unit is free-floating and could fall out if tipped—for
permanent, horizontal installations only.
10. Install the control panel in the desired location.
• The control panel can be installed remotely within
6' (1829 mm) of the shelf. Refer to the "Installing the
Control Panel Remotely" procedure in this section.
CAUTION
11. For HCSSBR and HCSSBFR models, install the
condensing unit in the desired location. Refer to the
SPECIFICATION section for installation dimensions.
• Make sure the installation site provides a level, stable
surface for mounting the condensing unit.
• Make sure the installation site offers continuous air flow
ventilation to the condensing unit.
• Make sure there is a minimum of 6" (152 mm) of space
between all sides of the condensing unit and any
combustible surface.
12. Have qualified installers perform the "Connecting the
Components" procedure in this section.
13. Clean the shelf thoroughly in preparation for initial
operation. Refer to the MAINTENANCE section for proper
cleaning procedures.
16
English
Form No. HCSRM-0817

Publicité

Chapitres

Table des Matières
loading

Table des Matières