Dometic PERFECTVIEW M7LS Instructions De Montage Et De Service page 18

Masquer les pouces Voir aussi pour PERFECTVIEW M7LS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
Mounting the monitor
To make and test the electrical connection, the following tools are required:
• Diode test lamp (1) or voltmeter (2)
• Insulating tape (10)
• Heat shrinking sleeve
• Hot air blower (11)
• Crimping tool (12)
• Soldering iron (optional) (13)
• Solder (optional) (14)
• Cable bushing sleeves (optional)
Depending on the individual installation requirements you may require bolts, nuts, washers, self-
tapping screws and cable binders other than those including in the scope of delivery.
7.2
Installing the monitor
!
CAUTION! Risk of injury!
Select the location of the monitor so that it cannot injure the passengers in the vehicle
under any circumstances (e. g. sudden braking, road traffic accidents).
Observe the following installation instructions:
• Select an installation location that provides an unobstructed view of the monitor (fig. 0,
page 6 and fig. a, page 6).
• Never install the monitor in area where your head could impact it or in the air bag deployment
path. This could cause injury if the airbag opens.
• The monitor must not impair your vision when driving (fig. b, page 7).
• The installation location should be flat.
• Check that there is sufficient space underneath the installation location to attach the washers
and nuts.
• Check beforehand that there is sufficient space on the other side for the drill head to come out.
• Bear in mind the weight of the monitor. Provide reinforcement if necessary (larger washers or
plates).
• Ensure that you can lay the connection cable set to the monitor.
18
M7LS
EN

Publicité

Table des Matières
loading

Table des Matières