27" Double Oven Traditional Installation; 27" Double Oven Flush Mount Installation; Prior To Installation; Lifting The Appliance - Bosch HBL5754UC Instructions D'installation

Masquer les pouces Voir aussi pour HBL5754UC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

en-us Prior to installation
9.2 27" Double oven traditional installation
*Junction box location: above, left or right of the unit within
reach of the flexible conduit.
Control panel overlap: min. 3/8" (10mm) to max.
2" (51mm).
9.3 27" Double oven flush mount installation
Flush installation requires two side cleats to be attached
inside the cabinet frame, recessed from the front.
Top view
Reveal cleats
Flush inset depth
14
Side view
Reveal cleats
Flush cutout height
10 Prior to installation

Prior to installation

Carry out these steps to prepare your appliance for instal-
Prior to installation
lation.
10.1 Lifting the appliance
Follow these recommendations to prevent injury and dam-
age to the appliance during lifting.
CAUTION
DO NOT attempt to lift the unit by holding the oven's upper
heating element.

Publicité

Table des Matières
loading

Table des Matières