Husqvarna epos reference station Manuel D'utilisation page 7

Masquer les pouces Voir aussi pour epos reference station:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
6.
Attach the connector to the clips on the arm.
7.
Tighten the screw (Torx 20) on the arm of the
reference station.
T20
1512 - 002 - 08.11.2021
8.
Connect the low-voltage cable to the reference
station and the power supply. Refer to
where to put the power supply on page 5 .
9.
Attach the low-voltage cable to the post from the
reference station to the power supply with cable
ties.
CAUTION:
cable is not attached tightly with cable
ties it can be damaged in hard wind.
10. Put the power supply at a minimum height of 30
cm / 12 in. from the ground.
11. Connect the power supply cable to a 100-240V
power outlet.
12. Wait until the LED status indicator is solid green.
First the LED status indicator is flashing green for
some minutes. Refer to
reference station on page 9 .
3.4.3 To install the reference station on a
wall
Note:
As wall materials vary, screws for fixing to the
wall are not included.
1.
Hold the arm for the reference station on the wall
where you will attach it. Make 4 marks on the wall
where you will attach 4 screws.
Note:
If the reference station is installed on a
wall the top of the reference station must be above
the wall.
2.
Drill 4 holes in the wall for the 4 screws.
3.
Install the reference station on the wall with 4
screws.
To examine
If the low-voltage
LED indicator lamp on the
Installation - 7

Publicité

Table des Matières
loading

Table des Matières