Installation; Lifting Instructions - ESAB Warrior Feed 304 Manuel D'instructions

Masquer les pouces Voir aussi pour Warrior Feed 304:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

US
7

INSTALLATION

The installation must be done by a professional.
WHEN WELDING IN AN ENVIRONMENT WITH INCREASED ELECTRICAL DANGER,
ONLY POWER SOURCES INTENDED FOR THIS ENVIRONMENT MAY BE USED.
THESE POWER SOURCES ARE MARKED WITH THE SYMBOL
7.1

Lifting instructions

Mounting a large (Ø 440 mm) bobbin changes the center of gravity, and tipping and
crushing hazards exist when lifting. Protect yourself and warn bystanders of the
risk!
To avoid personal injury and / or equipment damage, lift using method and
attachment points shown here.
Ordering number for the lifting eye can be found on page 64.
bm55d1a
- 12 -
© ESAB AB 2013

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Warrior feed 304w

Table des Matières