Télécharger Imprimer la page

fadini Elpro 7 RP Notice D'instruction page 4

Programmateur electronique pour nupi 66 avec tecnologie radio programmable
Masquer les pouces Voir aussi pour Elpro 7 RP:
Les langues disponibles
  • FR

Les langues disponibles

Elpro 7 RP
GB
PLUG-IN RADIO
CARD SUPPORT
L7
1
2 3
PROGRAMMING "P"
BUTTON
L1
L2
L3
L5
L4
L6
1
2
3
4
7
5
6
8
9
Elpro 7 RP is an electronic control panel developed for Nupi 66. The main feature of this unit is the capability to learn the required working times during
operation (gate delay in open and close cycles, dwell time). It is recommended to carry out the installation in strict compliance with the rules of good
technique and fit the system with ground stops in the Open and Closed positions.
ELECTRICAL CONNECTIONS:
- The control panel must be installed in a sheltered, dry place, inside the box provided with it.
- Fit the mains to the control panel with a 0.03A high performance circuit breaker.
- Use 1.5mm² section wires for voltage supply, electric motor and flashing lamp. Maximum recommended distance 50m.
- Use 1mm² section wires for limit switches, photocells, push-buttons/key-switch and accessories.
- Bridge terminals 1 and 2 if no photocells are required.
- Bridge terminals 3 and 6 if no key- or push-button switches are required.
N.W.: To fit extra accessories such as lights, CCTV etc. use only solid state relays to prevent damages to the microprocessor
WORKING LOGIC: Elpro 7 RP is supplied with pre-set working times so that to allow the first installation: Working time is about 20 s
Gate Delay Times: - Opening=2 s
Once satisfied that the system is working all right, new working times can be programmed to meet the user's needs or the installation requirements.
Elpro 7RP functions can be set by Dip-switches, both before and after the times have been stored by the unit.
LEARNING THE TIMES: ELPRO 7 RP learning operation is quite easy and can be achieved either by the P button on the PBC or by the remote control after
entering setting mode, see point 1).
Starting the unit to learn the required times: with the gate in closed position pulse the equipment to one complete cycle, ie. open-stop/dwell-close
Important:
1) In order to avoid setting times which are not suitable with the correct gate functioning, some time limits were pre-set. Beyond these values the automation
will start with the maximum pre-set time:
M1 and M2 Motor Run time: max.55s Dwell time on Automatic Mode: maximum 90s
2) During the learning operation, no other functions can be activated, the Photocells and the Stop button are out of service
3) If the new setting operation is interrupted (for example: mains cut off), the times in the previous setting are memorized.
4) Normally, not on programming mode, the P button has the same function as a remote control button and it is possible to test the system by pulsing it;
the Led 7 becomes a simple indicator, the same as the indicator to terminal 8.
24V 3W Indicator:
Led On = the Gate is Open
8
3
Led Off = the Gate is Closed
Fast Flash = closing movement
Slow Flash = opening movement
Led Status Indication:
L1=230V 50Hz power supply. Alight
L2=Photocells, if obstructed light goes off
L3=Open. Alight whenever an Open pulse is given
L4=Close. Alight whenever a Close pulse is given
L5=Stop. It goes off on pulsing Stop
L6=Radio. It goes on by pressing a transmitter button
L7=Gate Status; and programming led
Elpro 7 RP is to be powered with 230 V single-phase voltage. It is manufactured in conformity to 93/68/EC Low Voltage Safety Norms
and EMC 93/68/EC Norms for the Electro Magnetic Compatibility. Installation is to be carried out by quolified technicians in compliance
with the existing safety regulations. The manufacturer is not liable for incorrect use of the equipment and reserves the right to do changes
to the unit and this manual any time.
Drwg. No. 4153
pag. 4
DIP-SWITCH
ON
OFF
4 5 6 7 8
10
11 12 13
SINGLE-
PHASE
MOTOR M1
(actuator and
electric lock if
required)
- Closing=6 s
- Dwell on automatic Mode=15 s
2 A 2 4 V l o w
v o l t a g e f u s e
TRANSFORMER
1 2
3
4 5
ELECTRONIC TORQUE
CONTROL
14
15
16 17
19 20
18
M1
M2
SINGLE-
PHASE
MOTOR M2
Pedestrian Opening ( M1 Motor by Open pulse):
Partial opening for pedestrians is only allowed in closed gate
position by pulsing to Open (the gate closes after the dwell time
if set to Automatic Dip-Switch 3=ON)
-the first pulse operates 1 gate leaf (M1)
-the second pulse operates the second gate leaf
Dip-Switch:
1= ON Photocells, Stop during opening
2= ON Radio no reversing during Opening
3= ON Automatic Closing
4= ON Pre-flashing in service
5= ON Radio step by step
6= ON No delay on opening
7= ON Additional pushing on the gate leaf after closing
8= ON Pedestrian opening by Open button
Torque control setting:
Adjust torque from lower level (step 1) up to the
required amount of power step by step to achieve
a correct performance of the system so that the
gates are operated as required and any injuring
hazard is prevented.
Please note, torque is to be adjusted by a
technician.
LESS POWER
MORE POWER
1 2
3
4 5
ELECTRONIC
TORQUE CONTROL
OFF: Standard
8
DIP-SWITCH
1
2
4 5 6 7 8
3
ON: 1 gate leaf for
pedestrian opening
operation
ON
OFF
the gate opener
Made in Italy
loading