Initial Commissioning; Connection Of Peripheral Devices - KERN and SOHN DAB-BA-def-1813 Mode D'emploi

Analyseur électronique d'humidité
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.6.1 Initial Commissioning

In order to receive precise weighing results from electronic balances, the instrument
unit must have reached its operating temperature (see warming-up time chapter 1).
For this warm-up period the integrated balance must be connected to the power
supply.
The accuracy of the integrated balance depends on the local acceleration of gravity.
Please observe hints in chapter Adjustment.

7.7 Connection of peripheral devices

Before connecting or disconnecting of additional devices (printer, PC) to the data
interface, always disconnect the moisture analyser from the power supply.
Only use accessories and peripheral devices by KERN, as they are ideally tuned to
the appliance.
20
DAB-BA-e-1813

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dab 100-3Dab 200-2

Table des Matières