Epson ELPMB45 Guide D'installation page 24

Masquer les pouces Voir aussi pour ELPMB45:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.
Assemble the wall mount
1.
Attach the adjustment unit to the arm unit.
2.
Partially tighten the M4 × 12 mm hexagon socket head cap bolt and M8 × 16 mm hexagon socket
head cap bolt using the hexagonal wrenches (M4 and M8).
You need to change the position of the adjustment unit screws (B) if you are using the
q
wall mount with a product other than the PowerLite 520/525W/530/535W or
BrightLink 536Wi projectors.
3.
Attach the arm plate using a hexagonal wrench (M8) and four M8 × 16 mm hexagon socket head
cap bolts. Tighten the screws firmly.
M8 × 16 mm hexagon
socket head cap bolt (×4)
M4 × 12 mm hexagon socket head cap bolt
M8 × 16 mm hexagon socket head cap bolt
Adjustment unit
Arm plate
24
Arm unit

Publicité

Table des Matières
loading

Table des Matières