Installation Requirements; Tools And Parts - Jenn-Air JGS9900CDF Instructions Pour L'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools needed
Tape measure
Phillips screwdriver
Flat-blade screwdriver
¹⁄₈" flat-blade screwdriver
Saber or keyhole saw
Level
Drill
Wrench or pliers
Pipe wrench
⁵⁄₁₆" nut driver
¼" nut driver
¹⁵⁄₁₆" combination wrench
¹⁄₈" (3.2 mm) drill bit (for
wood floors)
Parts supplied
Check that all parts are included.
LP/Natural Gas Conversion Kit (taped behind access panel)
4 or 5 - Burner caps (depending on model)
2 - Burner grates
2 or 3 - Oven racks (depending on model)
Blower motor
2 - vent clamps
4

INSTALLATION REQUIREMENTS

Tools and Parts

Marker or pencil
Pipe-joint compound
resistant to LP gas
³⁄₁₆" (4.8 mm) carbide-tipped
masonry drill bit (for
concrete/ceramic floors)
Noncorrosive leak-detection
solution
For LP/Natural Gas
Conversions
½" combination wrench
¼" (6 mm) nut driver
⁹⁄₃₂" (7 mm) nut driver
Masking tape
Flexible vent
Flow tester card
Blower location template
4 - #8 x ¾" screws (for mounting blower motor bracket)
2 - #12 x 1⁵⁄₈" screws (for mounting anti-tip bracket)
Anti-tip bracket (taped to package containing literature in
oven cavity)
Anti-tip bracket must be securely mounted to the back wall or
floor. Thickness of flooring may require longer screws to
anchor bracket to subfloor. Longer screws are available from
your local hardware store.
Parts needed
One of the following Jenn-Air wall caps:
Jenn-Air
®
5" (12.7 cm) Round Surface Wall Cap Damper
Order Part Number A405
Jenn-Air
®
6" (15.2 cm) Round Surface Wall Cap Damper
Order Part Number A406
®
Jenn-Air
3¼" x 10" (8.3 x 25.4 cm) Surface Wall Cap Damper
Order Part Number A403
To order, see the "Assistance or Service" section of the Use
and Care Guide.
Metal ducting
Vent clamps
Concrete anchors (for concrete floor mounting)
Check local codes and consult gas supplier. Check existing gas
supply and electrical supply. See "Electrical Requirements" and
"Gas Supply Requirements" sections.

Publicité

Table des Matières
loading

Table des Matières