Make Gas Connection - Jenn-Air JGS9900CDF Instructions Pour L'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. Remove the bracket from the other side of the blower motor,
rotate 90° and secure with 4 locknuts.
8. Mount blower motor to floor using 4 - #8 x ¾" hex head
screws provided.
NOTE: Vent system will be connected after range has been
moved into its final location. "See Connect Range to
Downdraft System" in the "Installation Instructions" section.
B
A
A. 2⁷⁄₈" (7.3 cm) from back wall
to edge of bracket
B. Mounting bracket
C. Blower
9. Go to the "Make Gas Connection" section.
16
Top View
C

Make Gas Connection

WARNING
Explosion Hazard
Use a new CSA International approved gas supply line.
Install a shut-off valve.
Securely tighten all gas connections.
If connected to LP, have a qualified person make sure
gas pressure does not exceed 14" (36 cm) water
column.
Examples of a qualified person include:
licensed heating personnel,
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion, or fire.
Typical flexible connection
1. Open access panel by grasping sides and pulling upward,
lifting out.
2. Locate gas pressure regulator behind access panel.
A
A. Gas pressure regulator
3. Apply pipe-joint compound made for use with LP gas to the
smaller thread ends of the flexible connector adapters (see B
and G in the following illustration).
4. Attach one adapter to the gas pressure regulator and the
other adapter to the gas shutoff valve. Tighten both adapters.

Publicité

Table des Matières
loading

Table des Matières