Final Setup; Level The Dryer - GE GFDR485 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FINAL SETUP

LEVEL THE DRYER

1
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Raise
Lower
PLUG DRYER IN
2
Installation Instructions
Ensure proper
ground exists
before use.
30
DRYER START-UP
3
Press the Power button.
NOTE: If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
Power. Otherwise, the display will not come on.
The dryer is now ready for use.

Publicité

Table des Matières
loading

Table des Matières