Assembly / Operation - Hailo ProfiLine T350 Manuel D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31

6. Assembly / operation

6.1
Preliminary note on extending and
setting up the ladder
1. Place the collapsed ladder vertically with the crossbar [H]
on a firm level surface and place one foot in the middle
of the ground rung (1st rung) in order to secure the ladder.
The side with the release buttons [E], [F] show the user
that this is the front side and the correct side for climbing
the ladder.
2. First separately extend both positioning rails [D].
The positioning rails provide a secure position for using
the telescopic ladder.
Extend both positioning rails [D] completely; the release
buttons [E] must automatically lock securely in place.
• RED marking [E-1] is not visible =
the positioning rail is locked.
• RED marking [E-1] is visible =
the positioning rail is unlocked.
After extending the ladder, the red marking [E-1]
must no longer be seen.
If the red marking [E-1] still can be seen, the release
button [E] must be pressed (see 6.3), the positioning rail
pushed in, and the procedure repeated.
3. Always extend the telescoping ladder from the lowest
extendable rung upwards; the telescoping ladder must not
be extended using a rung from the middle or upper part.
A block formation (group of unextended ladder rungs)
must only occur in the uppermost ladder section.
1.
2.
3.
GB
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Profiline t4009113-1119113-131

Table des Matières