FIRst stARtInG.
W ARNING: The first machine starting operations must be carried out by a specialised and authorised technician.
Open the water supply tap upstream of the machine.
Power the machine by setting the differential switch located upstream of the machine to ON.
Set the switch (1) to ON; the LED (2) will come on and the boiler will start to fill with water.
W ARNING: If filling does not start within 120 seconds, the machine goes into alarm and the LEDs positioned on the
selector knob of the units will come on flashing.
Turn the machine on and off again to complete filling the boiler with water.
Once filling is complete, the water in the boiler will start heating up indicated by the LED (3) coming on.
When the set temperature has been reached, the LED (3) will go off and the pressure in the boiler will be 1 bar (0.1 MPa) indicated
on the pressure gauge (4).
Dispense a few times from the units, water tap and steam nozzles checking proper functioning (see the paragraph on operation
for how to operate).