Test Equipment - Ge Rak149F2A Manuel D'utilisation Et Instructions D'installation

Table des Matières
INSTALLATION INSTRUCTIONS

TEST EQUIPMENT

Turn on power to the system.
Fan Operation
1.) Move fan switch to Low position. The blower should begin to operate at
low speed .
2.) Move fan switch to Auto Low position. The blower should stop
immediately.
3.) Move fan switch to High position. The blower should begin to operate at
high speed.
4.) Move fan switch to Auto High position. The blower should stop
immediately.
Heating System
1.) Move System Switch to Heat position.
1st stage heat should begin to operate.
thermostat 3º above room temperature. Resistance heat should begin
to operate.
The heating system should stop operating.
Cooling System
1.) Move System Switch to Cool position.
blower should come on immediately, followed by cold air circulation.
The thermostat will indicate Cool On. There can be up to a 5 minute
delay. (see INSTALLER MENU, item 50)
The cooling system should stop operating.
Note: The default position for the compressor lockout is OFF in the
INSTALLER menu, item 50. When compressor lockout is turned ON
Starting Soon will be visible on the display. If Starting Soon is shown on
the display, the compressor lockout feature is operating. There will be up to
a 5 minute delay before the compressor turns on.
6
49-5000769 Rev. 1

Chapitres

Table des Matières
loading

Table des Matières