ECOFOREST VAP 5-20 CW Manuel D'installation Et Maintenance page 53

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67

Stainless steel hose clamp.

T of 90° with outlet.

Wooden ground.

Non flammable floor protection.

Stainless steel flexible tube.

Rigid flexible pole adapter.

Minimum 200mm.

It must exceed roof height by 1 metre.
If the tube over 4 m in length, the next larger

size will be used.
To access the purgecock, we must remove the cap of the liner covering it and the safety thermostat. It is
located in the upper left side of the boiler. It is important to note that the purge should be performed by an
authorized installer.

Purger.
WI-FI ANTENNA CONNECTION, POWER CABLE, ROOM THERMOSTAT, KEYBOARD AND KEYBOARD SUPPORT.
The boiler is supplied with a Ecoforest box. This box contains the user manual, the installation and
maintenance manual, a power cable, a room sensor, a cleaning brush, a Wi-fi antenna.
The user has to attach the wi-fi antenna and module to the connection platform (check section 1 of the
tablet manual). The connection platform of the wi-fi antenna is supplied attached to the rear of the hopper.
The room sensor and power cable must be connected to the rear heaters, in the right-hand side of the boiler.

Power connection ~230/240V - 50Hz.

Thermostat connection.
HEATING SYSTEM DRAINING (VERY IMPORTANT).
52
Drawing 16

Drawing 14
Drawing 15
Drawing 17

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Vap 24 cvVap 30 cg30

Table des Matières