ECOFOREST VAP 5-20 CW Manuel D'installation Et Maintenance page 50

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67

Male eyebolt DIN580 M12
Broad brimmed washer DIN9021

M12

Hex nut DIN934 M12
Select appropriate slings to the weight of the boiler. (See specifications of the boiler).
Respect minimum elevation angle of the sling and verify proper load sharing between them.
If the lifting is done without having removed the hopper assembly - boiler body, the hopper must be empty.
Attention!: If the boiler is lifted in full, it will pitch. Lift carefully.
For future maintenance or repairs, distances from walls and ceilings must be respected.
x4
x4
x4
Drawing 10
CLEAR DISTANCES.
49
Drawing 9

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Vap 24 cvVap 30 cg30

Table des Matières