HSI 90/HSI 150. How to set in concrete correctly.
Contents
1 General information and intended use
2 General notes/safety instructions
3 Description
4 Scope of delivery
5 Required tools and auxiliaries
6 Installation
1
General information and intended use
Standard system solution for cable entries.
2
General information
•
Any national regulations regarding the laying and backfilling of pipework must be fol-
lowed in all cases.
•
compact the underground and cable support well before laying the cables/pipes to prevent
settlement, which the cables sinking.
•
The incorrect laying of cables or ducts and improper filling of the cable trench causes
settlement, which can lead to damage and leaks.
•
Cables and pipes should not be supposed to mechanical load.
•
Do not use solvent-based cleaning agents to clean cable entries. We recommend using
cable cleaner KR M.T.X.
•
When connecting �
optimsed compacting of conctrete and cable trench refill (HSI-AH 40 increases the distance
between centre lines from 210 mm to 250 mm).
•
Further accessories and information at www.hauff-technik.de and in the technical data
sheets.
Safety instructions
•
In the case of duct connections, the system safety of the cable entry depends on how
tightly the duct system is sealed, insofar as no cable sealing is carried out.
•
It is important to protect the wall insert from damage, moisture and impurities during
installation. Check that all necessary components have been delivered and that they are
not damaged
•
Damaged components must not be installed.
•
Installation must comply with the relevant professional association regulations, VDE provi-
sions, national safety and accident prevention regulations as well as company regulations
(work and procedural instructions).
= 160 mm, we recommend using the HSI-AH 40 spacer to ensure
a
10