4 Commissioning

Wall mounting
© 11/14 Mettler-Toledo AG, CH-8606 Greifensee
Printed in Switzerland
DANGER
Please refer to chapter 2 "Safety".
All work on the system's electrical components may only be performed by authorized,
specialist staff.
NOTICE
During commissioning, please proceed according to section 4.3 "Installation and
commissioning". Note the references to more detailed information.

4.1 Fitting

The EasyClean100 and 150 are designed to be fitted directly (c-rails), on to walls or posts/
pipes. The EasyClean 100 and 150 are built into the same type of housing and therefore have
the same dimensions.
The fitting location must have sufficient stability and must as far as possible be free of vibration.
Please make sure that the lengths of the leads are as short as possible.
EasyClean100/150
EasyClean100/150
52 500 178