Télécharger Imprimer la page

AfG Berlin EM70/40 PCG Serie Installation-Emploi-Entretien page 21

Publicité

Les langues disponibles
  • FR

Les langues disponibles

CONNECTION TO THE WATER DRAIN
The water drainage system must be made using
materials resistant to temperatures of 100 °C.The
bottom of the appliance must not be subjected to
steam produced by drainage of hot water.
Install a siphoned floor drain with grating below the
water drain cock of Boiling pans and in front of Bratt
pans.
8. CONVERSION TO ANOTHER
TYPE OF GAS
Table Tab1 specifies:
- which gas can be used for the appliance.
- the nozzles and settings for each gas that can be
used.
For nozzles, the number indicated in table TAB1 is
also stamped on the body of nozzles.
To convert the appliance to the local gas type,
follow the instructions given in TAB1 andcarry out
the steps below:
- Replace the main burner nozzle (UM).
- Adjust the main burner's air regulator to distance A.
- Replace the pilot burner nozzle (UP).
- Adjust the pilot burner air " ow (if necessary).
- Replace the gas valve minimum nozzle (Um).
- Affix the adhesive tab indicating the new type of gas
used.
- The nozzles and adhesive tabs are supplied with the
appliance.
GAS HOB
REPLACING THE MAIN BURNER NOZZLE
Remove the control panel.
Remove the panstand grids and burners.
Remove nozzle UM and replace it with the one
indicated in table TAB1.
Retighten nozzle UM.
Reassemble all parts. For assembly, proceed in
reverse order.
REPLACING THE MINIMUM ADJUSTMENT SCREW
Remove the control panel.
Remove nozzle UM and replace it with the one
indicated in table TAB1.
Retighten nozzle UM.
Reassemble all parts. For assembly, proceed in
reverse order.
REPLACING THE PILOT BURNER NOZZLE
Remove the control panel.
Remove the 3 screws securing the venturi to the
hob and pull the venturi out by approx. 10 cm.
Undo connector R.
Remove nozzle UP and replace it with the one
indicated in table TAB1.
Retighten connector R. Reassemble all parts.
For assembly, proceed in reverse order.
GAS SOLID TOP RANGES
REPLACING THE MAIN BURNER NOZZLE AND
ADJUSTING THE PRIMARY AIR FLOW
Remove the control panel.
Remove nozzle UM and replace it with the one
indicated in table TAB1.
Retighten nozzle UM.
Slacken screw V and position the air regulator at
distance A as indicated in table TAB1.
Retighten screw V fully.
Reassemble all parts. For assembly, proceed in
reverse order.
REPLACING THE MINIMUM ADJUSTMENT SCREW
Remove the control panel.
Remove nozzle UM and replace it with the one
indicated in table TAB1.
Retighten nozzle UM.
Reassemble all parts. For assembly, proceed in
reverse order.
REPLACING THE PILOT BURNER NOZZLE
Remove the hotplate.
Remove the control panel and internal guards.
Undo connector R.
Remove nozzle UP and replace it with the one
indicated in table TAB1.
Retighten connector R. Reassemble all parts.
For assembly, proceed in reverse order.
GAS OVEN
REPLACING THE MAIN BURNER NOZZLE AND
ADJUSTING THE PRIMARY AIR FLOW
Open the oven door.
Remove the panel on the oven door.
Slacken screw V.
Remove nozzle UM (fitted to air regulator Z) and
replace it with the one indicated in table TAB1.
Retighten nozzle UM(fitted to air regulator Z).
21

Publicité

loading