Télécharger Imprimer la page

Kohler K-702205 Guide D'installation page 6

Publicité

Les langues disponibles

Les langues disponibles

Bottom
Track
2. Install the Bottom Track
Apply a 1/4" (6 mm) bead of silicone sealant into the groove on the underside of the track.
Install the bottom track 5/8" back from the front of the bath/shower ledge with the sealant side
down, the front leg facing the outside of the shower, and an equal gap on each end between the
wall and track.
Temporarily secure the bottom track to the threshold with masking tape.
1054857-2-B
Leg faces outside
of shower.
Apply
sealant.
6
Bottom
Track
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-702207K-702209K-702217