Installation; General - Hatco GLO-RAY GR3SDS-39DCT Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour GLO-RAY GR3SDS-39DCT:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

General

Glo-Ray
Heated Glass merchandisers are shipped with most
®
components installed and ready for operation. The following
installation instructions must be performed before plugging in
and operating the cabinet.
WARNING
ELECTRIC SHOCK HAzARD: Unit is not weatherproof.
Locate the unit indoors where the ambient air temperature
is a minimum of 70°F (21°C).
FIRE HAzARD: Locate control side of unit a minimum of
3" (76 mm) and all other sides a minimum of 1" (25 mm)
from combustible walls and materials. If safe distances are
not maintained, combustion or discoloration could occur.
CAUTION
Locate unit at the proper counter height in an area that is
convenient for use. The location should be level to prevent
the unit or its contents from falling accidentally and strong
enough to support the weight of the unit and contents.
NOTICE
Locate in an area that avoids air current around unit. Avoid
areas that may be subject to active air movements or
currents (i.e, near exhaust fans/hoods, exterior doors, and
air conditioning ducts).
Do not lay unit on the side with the control panel or
damage to the unit could occur.
1. Remove the unit from the carton. Two people are required
for this step.
NOTE: To prevent delay in obtaining warranty coverage,
complete online warranty registration. See the
ImPORTaNT OWNER INFORmaTION section for
details.
2. Install the 2-1/2" (64 mm) legs onto the bottom of the unit.
a. Remove the box stop/sign holder on each shelf (not
canopy).
b. Carefully lay the unit on its side. This step requires two
people.
NOTE: Place a piece of cardboard between the unit and the
floor to prevent marring the unit finish.
c. Install each leg. Hand-tighten the legs until snug. Do not
over-tighten.
d. Return the unit to its upright position. This step requires
two people.
e. Replace the box stop/sign holder on each shelf.
Installing the Legs
2-1/2" (64 mm) Leg
6
3. Remove tape and protective packaging from all surfaces
of unit.
4. Install the glass side panels. To install:
a. angle the top of the glass panel into the upper channel.
b. Carefully lower the panel into the lower channel.
Glass Side Panel angled slightly.
Installing the Glass Side Panels
5. Place the unit in the desired location.
• Locate the unit in an area where the ambient air
temperature is constant and a minimum of 70°F (21°C).
avoid areas that may be subject to active air movements
or currents (i.e., near exhaust fans/hoods, exterior doors,
and air conditioning ducts).
• make sure the unit is at the proper counter height in an
area convenient for use.
• make sure the countertop is level and strong enough to
support the weight of the unit and food product.
• make sure all the feet on the bottom of the unit are
positioned securely on the countertop.
6. Level the unit by turning the leveling nut on each leg, if
necessary. When looking at the bottom of the unit, turning
the nut counterclockwise will lengthen the leg, and turning
the nut clockwise will shorten the leg.
English
Form No. GR3SDSCTm-0614

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Glo-ray gr3sds-39tct

Table des Matières