Télécharger Imprimer la page

Toshiba RAS-18N3KCV Serie Instructions D'installation page 10

Masquer les pouces Voir aussi pour RAS-18N3KCV Serie:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
Refrigerant Piping Connection
Flaring
1. Cut the pipe with a pipe cutter.
Obliquity
90
2. Insert a fl are nut into the pipe and fl are the pipe.
 Projection margin in fl aring : A (Unit : mm)
Rigid (clutch type)
Outer dia.
R410A tool used
of copper pipe
6.35 mm
0 to 0.5
12.70 mm
0 to 0.5
Imperial (wing nut type)
A
Outer dia. of copper pipe
6.35 mm
Die
Pipe
12.70 mm
Tightening connection
Align the centers of the connecting pipes and tighten the fl are nut as far as
possible with your fi ngers. Then tighten the nut with a spanner and torque
wrench as shown in the fi gure.
Half union
Externally
threaded side
Use a wrench to secure.
Use a torque wrench to tighten.
CAUTION
Do not apply excess torque. Otherwise, the nut may crack depending on
the conditions.
Outer dia. of copper pipe
6.35 mm
12.70 mm
 Tightening torque for connection of fl are pipe
The pressure of R410A is higher than R22.
(Approx. 1.6 times.) Therefore securely
tighten the fl are pipes which connect the
outdoor unit and the indoor unit with the
specifi ed tightening torque using a torque
wrench. If any fl are pipe is incorrectly
connected, it may cause not only
a gas leakage but also trouble in the
refrigeration cycle.
Evacuating
After the piping has been connected to the indoor unit, you can perform
vacuuming together at once.
VACUUMING
Evacuate the air in the connecting pipes and in the indoor unit using a
vacuum pump. Do not use the refrigerant in the outdoor unit. For details, see
the manual of the vacuum pump.
Using a vacuum pump
Be sure to use a vacuum pump with counter-fl ow prevention function so
that inside oil of the pump does not fl ow backward into pipes of the air
conditioner when the pump stops.
(If oil inside of the vacuum pump enters the air conditioner, which use
R410A, refrigeration cycle trouble may happen.)
All manuals and user guides at all-guides.com
1. Connect the charge hose from the manifold valve to the service port of
2. Connect the charge hose to the port of the vacuum pump.
3. Open fully the low pressure side handle of the gauge manifold valve.
4. Operate the vacuum pump to start evacuating. Perform evacuating for
5. Close the low pressure side valve handle of the gauge manifold valve.
6. Open fully the valve stem of the packed valves (both gas and liquid
Roughness
Warp
7. Remove the charging hose from the service port.
8. Securely tighten the caps on the packed valves.
Conventional
tool used
1.0 to 1.5
1.0 to 1.5
R410A
1.5 to 2.0
2.0 to 2.5
Flare nut
Internally
threaded side
(Unit : N·m)
• Open the valve stem all the way out, but do not try to open it beyond the
Tightening torque
14 to 18 (1.4 to 1.8 kgf·m)
50 to 62 (5.0 to 6.2 kgf·m)
Flare at
• Securely tighten the valve cap with torque in the following table:
indoor unit side
Flare at
outdoor unit side
1. Remove the valve cover, the electric parts cover and the cord clamp from
2. Connect the connecting cable to the terminal as identifi ed by the matching
3. Insert the power cord and the connecting cable carefully into the terminal
4. Use vinyl tape, etc. to insulate the cords which are not going to be used.
5. Secure the power cord and the connecting cable with the cord clamp.
6. Attach the electric parts cover and the valve cover on the outdoor unit.
8
the packed valve at gas side.
about 15 minutes if the piping length is 20 meters. (15 minutes for 20
meters) (assuming a pump capacity of 27 liters per minute) Then confi rm
that the compound pressure gauge reading is –101 kPa (–76 cmHg).
sides).
Compound pressure gauge
–101 kPa (–76 cmHg)
Handle Lo
Charge hose
(For R410A only)
Connecting pipe
Packed valve at gas side
Service port (Valve core (Setting pin))
Packed valve at liquid side
CAUTION
 KEEP IMPORTANT 5 POINTS FOR PIPING WORK.
(1) Take away dust and moisture (inside of the connecting pipes).
(2) Tighten the connections (between pipes and unit).
(3) Evacuate the air in the connecting pipes using a VACUUM PUMP.
(4) Check gas leak (connected points).
(5) Be sure to fully open the packed valves before operation.
Packed valve handling precautions
stopper.
Pipe size of Packed Valve
12.70 mm and smallers
15.88 mm
Cap
Cap Size (H )
Torque
14~18 N·m
H17 - H19
(1.4 to 1.8 kgf·m)
Valve Rod
Cap
33~42 N·m
H22 - H30
(3.3 to 4.2 kgf·m)
8~12 N·m
H14
(0.8 to 1.2 kgf·m)
Service Port
Cap
14~18 N·m
H17
(1.4 to 1.8 kgf·m)
Wiring Connection
the outdoor unit.
numbers on the terminal block of indoor and outdoor unit.
block and secure it tightly with screws.
Locate them so that they do not touch any electrical or metal parts.
Toshiba 1110651187 (EN)
Pressure gauge
Manifold valve
Handle Hi
(Keep full closed)
Charge hose
(For R410A only)
Vacuum pump adapter for
counter-fl ow prevention
(For R410A only)
Vacuum
pump
Size of Hexagon wrench
A = 4 mm
A = 5 mm
Hexagon wrench
is required.
A
H
Service Port Cap
Valve Rod Cap

Publicité

loading

Ce manuel est également adapté pour:

Ras-22n3kcv serieRas-18n3acv serieRas-22n3acv serie