Hoonved AP 43 E Mode D'emploi Et D'entretien page 37

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Part 3: For the technician
IMPORTANT
Every operation of installation, electrical or hydraulic
connection, programming, maintanance etc...has to
be carried out by QUALIFIED personnel, authorised
by the manufacturer;
any interventions carried out by UNQUALIFIED person-
nell, may compromise the technician's own safety, as
well as the safety of other personnel (operators, etc.)
or of any other equipment connected to the washing
machine.
The manufacturer declines all responsability for
accidents or damage to persons or property caused
by failure to comply with the above listed provisions.
3.1
INSTALLATION (Fig. 6)
-
After having removed the packing, check that the
machine is in a perfect condition and that all the parts
have been included.
-
Position the machine in the required setting and level
it by means of the feet (10).
3.1.a Drain pipe connection (Fig. 6)
-
Connect one end of the drain pipe to the overflow
(11) and the other to an already prepared drain
trap.
IMPORTANT
It is essential to ensure that the drain pipe runs along
the floor and that it is not throttled in any part.
3.1.b Connection to the water main (Fig. 6)
-
Connect one end of the supplied inlet pipe (12) to
the solenoid valve and the other end (12) to a 3/4"
G threaded cock, installing the filter (13) in between.
ATTENTION
It is essential to connect the cold water delivery pipe to a
throttle cock in order to separate the water main from the
machine itself. Also check that there are no sharp bends.
If there is sand in the water main, it will be necessary to
install a filter between the water main and the machine.
If the water main is without, it is advisable to install a
decalcifier prior to the machine with a setting of min. 4
and max. 8 French degrees.
The manufacturer declines all responsibility for da-
mage to the machines caused by failure to comply
with the above listed provisions.
3.1.c Electrical connection (Fig. 5)
DANGER
-
Before connecting to the electricity main, always
check that the data pertaining to the power source
correspond to those indicated on the identification
plate (pos. 9 Fig. 5) and that the main electric power
switch installed prior to the machine is discon-
nected "0" OFF.
-
An appropriately sized omnipolar circuit-breaker
with a minimum 3 mm gap between its contacts
must be installed between the power supply main
and the machine.
-
Connect the electrical power cable (14) to the main
switch installed prior to the machine
-
Connect the equipotential ground conductor to the
terminal (15).
The electrical power cable can NOT be replaced
by USER but only by technical.
There must be an effective system grounding,
according to current standards of prevention, for
operator safety and equipment.
The power cord must not be put in traction or
crushed during normal operation or routine main-
tenance.
The terminal of equipotentiality fixed to the body
must be connected to an equipotential bonding
conductor of section suitable for the application.
Observe the polarity of the wiring diagram.
For more information, refer to the wiring diagram.
The manufacturer declines all responsibility for
accidents or damage to persons or property caused
by failure to comply with the above listed provisions.
3.2. STANDARD Parameter Settings
With the machine switched off, press the "SI" button for
10 sec.; all parameters (P-T-L) are automatically set as
in the tables.
The message "PSt" will appear on the display, con
firming that the settings have been programmed.
ENGLISH
37

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ap 48 eAp 53 eAp 60 eFw 35 eFw 40 eFw 45 e ... Afficher tout

Table des Matières