Télécharger Imprimer la page

CAME BX-246 Manuel Pour L'installation page 28

Automatisme pour portails coulissants
Masquer les pouces Voir aussi pour BX-246:

Publicité

Les langues disponibles

Les langues disponibles

4.3 Description of parts
1 - Top cover
2 - Settings casing
3 - Control board support
4 - Endstop fins
5 - ZD2 electronic card
6 - Front cover to control panel
7 - Gearmotor release door
8 - Securing plate
9 - Securing bolt
10 - Securing screw plate
11 - Nut
4.4 Dimensions
5 Installation
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
5.1 Preliminary checks
Before installing, do the following:
• Make sure that the gate is stable, and that the castors are in good working order and properly greased.
• The ground rack must be well secured to the ground, entirely above the surface and free of any irregularities that may obstruct the
gate's movement.
• The upper guide rails must not create any friction.
• Make sure that there is a closing and an opening endstops.
• Make sure that the operator is attached to a solid surface and protected from any impacts;
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
Check that any connections inside the container (that provide continuity to the safety circuit) are fitted with additional insulation
compared to other internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
1
11
2
10
2
3
7
8
9
4
6
5

Publicité

loading