Télécharger Imprimer la page

Husqvarna EPOS Reference Station Manuel D'utilisation page 55

Masquer les pouces Voir aussi pour EPOS Reference Station:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 63
6.
Attach the connector to the clips on the arm.
7.
Tighten the screw (Torx 20) on the arm of the
reference station.
T20
1512 - 005 -
8.
Connect the low-voltage cable to the reference
station and the power supply. Refer to
where to put the power supply on page 53 .
9.
Attach the low-voltage cable to the post from the
reference station to the power supply with cable
ties.
CAUTION:
cable is not attached tightly with cable
ties it can be damaged in hard wind.
10. Put the power supply 30-200 cm / 1-6.5 ft. above
To examine where to put the
the ground. Refer to
power supply on page 53 .
11. Connect the power supply cable to a 100-240V
power outlet.
12. Wait until the LED status indicator is solid green.
First the LED status indicator is flashing green for
some minutes. Refer to
reference station on page 58 .
35.4.3 To install the reference station on a
wall
Note:
As wall materials vary, screws for fixing to the
wall are not included.
1.
Hold the arm for the reference station on the wall
where you will attach it. Make 4 marks on the wall
where you will attach 4 screws.
Note:
If the reference station is installed on a
wall the top of the reference station must be above
the wall.
2.
Drill 4 holes in the wall for the 4 screws.
3.
Install the reference station on the wall with 4
screws.
To examine
If the low-voltage
LED indicator lamp on the
Installation - 55

Publicité

loading