Télécharger Imprimer la page

Zephyr ARC Serie Guide D'utilisation, D'entretien Et D'installation page 8

Publicité

INSTALLING THE DUCTWORK:
INTERNAL BLOWER
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide where the ductwork will run
between the hood and the outside.
2. A straight, short duct run using a minimum
6" round duct will allow the hood to perform
most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect round
metal ductwork to cap and work back
towards hood location. Use duct tape to seal
the joints between ductwork sections
(Fig.7).
PREPARE FOR INSTALLATION
Model Incline
Remove the (2) screws and take off the front
panel. See Fig. 8.
Model Wave
1. Open the upper front glass; remove the
lower glass unscrewing (2) screws and
moving it upward (Fig.9).
2. Remove the metal panel unscrewing (6)
screws. Fig. 10.
Model Wave
All manuals and user guides at all-guides.com
Model Incline
FIG. 9
- 16 -
OPTIONAL
DUCT COVER
HOOD
22" MINIMUM ABOVE COOKING
SURFACE
Model Wave
ROOF CAP
6" ROUND DUCT
WALL
CAP
FIG. 7
FIG. 8
FIG.10

Publicité

loading

Ce manuel est également adapté pour:

Arc ain-m80awxArc ain-m80asxArc awa-m90awxArc awa-m90abx