Télécharger Imprimer la page

Dometic HB2325 Installation, Usage, Entretien page 33

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
Built in hole dimensions
h
Depending on the model, make a hole in the cabinet as shown in Fig. 3, page
3.
h
The cabinet must be parallel to and flush with the horizontal worktop.
h
The cabinet built-in hole must be parallel. If the cabinet has aeration openings,
prevent combustible materials from accessing these openings.
5.2 Gas connection
CAUTION!
Check this data before connecting the appliance to the gas cylinder.
Pressure reducing valves to be used between the gas cylinder and the
appliance must conform to the categories listed in the table below.
This appliance can be operated with the gases and related pressures described in
the following table. The identification label glued to the appliance clearly shows the
category (or categories) according to which the appliance has been adjusted.
CATEGORY AND COUNTRIES OF
DESTINATION
I3B/P(30)
AT BE DE DK FI GB NL NO PT SE SI
I3+ (28-30/37)
BE CH ES FR GB IE IT PT SI
EN
Installation
GAS PRESSURE
30 mbar Butane (G30)
30 mbar Propane (G31)
28-30 mbar Butane (G30)
37 mbar Propane (G31)
33

Publicité

loading

Ce manuel est également adapté pour:

Hb3400Hb4500Hbg2335Hbg3341Hbg3445Hsg2445 ... Afficher tout