Emerson PORTLAND CF965BS00 Instructions page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Ceiling Fan Assembly
3.14
Place the ceiling cover over the downrod.
Be sure the ceiling cover is oriented correctly
(Figure 11).
3.15
Route the two 80" motor leads through the hanger ball.
Reinstall the hanger ball (Figure 12) on the downrod as
follows:
Position the hanger ball pin through the two holes in the
downrod and align the ball so the pin is captured in the
groove in the top of the hanger ball.
Pull the hanger ball up tight against the pin and securely
NOTE: A loose setscrew could create fan wobble.
tighten the setscrew in the hanger ball.
WARNING
!
It is critical that the pin in the hanger ball is properly
installed and the setscrew securely tightened. Failure to
verify that the pin and setscrew are properly installed
could result in the fan falling.
3.16
The fan comes with black and white leads that are
80-inches long.
Before installing the fan, measure up approximately
6 to 9-inches above top of hanger ball/downrod assembly
(Figure 13).
Cut off excess leads and strip back insulation 1/2-inch
from end of leads.
If installing the Optional AL100 Accent Light, Skip to Section 7.
(Continued)
Figure 11
PIN
Figure 12
Figure 13
Please contact 1-800-654-3545 for further assistance
9
4.5" DOWNROD
CEILING
COVER
4.5" DOWNROD
HANGER BALL
SETSCREW
6 to 9
INCHES
HANGER BALL/
DOWNROD
ASSEMBLY
emersonfans.com
ETL Model No.: CF965

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Portland cf965vnb00

Table des Matières