GE GTUP240EWH Instructions D'installation page 5

Laveuse/sécheuse electriques unifiées
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GROUNDING INSTRUCTIONS (Cont.)
Do not modify the plug provided with the appliance. If it
will not fit the outlet, have a proper outlet installed by a
qualified electrician.
B. For permanently connected appliance:
This appliance must be connected to a grounded,
metal, permanent wiring system, or an equipment-
grounding conductor must be run with the circuit
conductors and connected to the equipment ground-
ing terminal or lead on the appliance.
CONNECTING APPLIANCE USING 4-WIRE
CONNECTION (MUST BE USED FOR
MOBILE HOME INSTALLATION)
NOTES: SInce January 1,1996, the National Electric code
requires that the new constructions utilize a 4-wire
connection to an electric dryer.
WARNING:
be used when the appliance is installed in a location
where grounding through the neutral conductor is
prohibited. Grounding through the neutral is prohibited
for the new branch-circuit installations, mobile homes,
recreational vehicles, and areas where local codes
prohibit grounding through the neutral conduction.
REMOVE GROUND STRAP
AND DISCARD. KEEP GREEN
GROUND SCREW
SCREWS
(3)
COVER
1. Turn off the circuit breaker (s) (30 amp) or remove the
dryer's circuit fuse at the electrical box.
2. Be sure the appliance cord is unplugged from the wall
receptacle.
3. Remove the power cord cover located at the lower
back.
4. Remove and discard ground strap. Keep the green
ground screw for step 7.
5. Install 3/4 in. UL recognized strain relief to power cord
entry hole. Bring power cord through strain relief.
6. Connect power cord as follows:
A. Connect the 2 hot lines to the outer screws of
the terminal block (marked L1 and L2).
B. Connect the neutral (white) line to the center of
the terminal block (marked N).
7. Attach ground wire of power cord with the green
ground screw (hole above strain relief bracket). Tighten all
terminal block screws (3) completely.
Installation Instructions
Only a 4-conductor cord shall
HOT
WIRE
RELOCATE GREEN
GROUND SCREW
HERE
GREEN OR
L 1
YELLOW WIRE
N
STRAIN
L 2
RELIEF
BRACKET
NEUTRAL
(White)
3/4", UL
RECOGNIZED
HOT
STRAIN RELIEF
WIRE
4 #10 AWG MINIMUM COPPER
CONDUCTORS OR 120/240V 30A POWER
SUPPLY CORD KIT MARKED FOR USE
WITH DRYERS & PROVIDED WITH
CLOSED LOOP OR SPADE TERMINALS
WITH UPTURNED ENDS (NOT SUPPLIED).
8. Properly secure power cord to strain relief.
9. Reinstall the cover.
WARNING:
COVER OFF OF THE TERMINAL BLOCK.
CONNECTING DRYER USING 3-WIRE
CONNECTION
SCREWS
(3)
COVER
1. Turn off the circuit breaker(s) (30 amp) or remove the
dryer's
circuit fuse at the electrical box.
2. Be sure the dryer cord is unplugged from the wall.
3. Remove the power cord cover located at the lower
back.
4. Install 3/4 in. UL recognized strain relief to power cord
entry hole. Bring power cord through strain relief.
5. Connect power cord as follows:
A. Connect the 2 hot lines to the outer screws of
the terminal block (marked L1 and L2).
B. Connect the neutral (white) line to the center of
the terminal block (marked N).
6. Be sure ground strap is connected to neutral (center)
terminal of block and to green ground screw on cabinet
rear. Tighten all terminal block screws (3) completely.
7. Properly secure power cord to strain relief.
8. Reinstall the cover.
WARNING:
COVER OFF OF THE TERMINAL BLOCK.
5
NEVER LEAVE THE
GROUND
GREEN
GROUND
STRAP
SCREW
HOT
STRAIN RELIEF
WIRE
BRACKET
L 1
3/4", UL
RECOGNIZED
L 2
STRAIN RELIEF
NEUTRAL
HOT
(White)
WIRE
3 #10 AWG MINIMUM COPPER
CONDUCTORS OR 120/240V 30A POWER
SUPPLY CORD KIT MARKED FOR USE
WITH DRYERS & PROVIDED WITH CLOSED
LOOP OR SPADE TERMINALS WITH
UPTURNED ENDS (NOT SUPPLIED).
NEVER LEAVE THE

Publicité

Table des Matières
loading

Table des Matières