Installation Instructions - GE GTUP240EWH Instructions D'installation

Laveuse/sécheuse electriques unifiées
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION REQUIREMENTS LOCATION
This appliance must be installed on firm flooring to
minimize vibration during spin cycle. Concrete flooring is
best, but wood base is sufficient, provided floor support
meets FHA standards. This appliance should not be
installed on rugs or exposed to weather.
PLUMBING
WATER PRESSURE - Must be 20 psi minimum to 120 psi
maximum.
WATER TEMPERATURE - Household water heater should be
set to deliver water at 120° to 150°F (50° to 66°C) IN THE
WASHER when hot wash is selected.
SHUTOFF VALVES - Both hot and cold shutoff valves
(faucets) should be supplied.
DRAIN - Water may be drained into standpipe or set tub.
Discharge height MUST NOT BE LESS THAN 30 INCHES,
and no more than 6 feet above the base of the washer.
Standpipe must be 1-1/2 inches minimum inside diameter
and must be open to atmosphere.
Step 1 Prepare the Area and Exhaust for Installation of
Appliance (see section 1).
Step 2 Check and Ensure the Existing External Exhaust is
Clean (see section 1) and Meets Attached Installation
Specifications (see section 3).
Step 3 Remove the Foam Shipping Pads (see section 1).
Step 4 Move the Appliance to the Desired Location.
Step 5 Connect the Power Supply (see section 2).
Step 6 Connect the External Exhaust (see section 4).
Step 7 Level Your Appliance (see section 5).
Step 8 Connect to plumbing facilities (see section 8).

Installation Instructions

ELECTRICAL REQUIREMENTS
CAUTION:
Before plugging in washer, read the follow-
ing electrical requirements.
CAUTION:
For personal safety, do not use an
extension cord or adapter plug with this appliance. Do
not, under any circumstances, cut or remove the third
grounding prong from the power cord. Follow national
electrical codes and ordinances. This appliance must be
supplied with the voltage and frequency indicated on the
rating plate (located at the top of the dryer front panel),
and connected to an individual, properly grounded branch
circuit, protected by a 15- or 20-amp circuit breaker or
time-delay fuse. If the electric supply provided does not
meet the above requirements, call a licensed electrician.
Step 9 Check the Operation of the Power Supply
and Venting.
Step 10 Place the Owners Manual and the Installation
Instructions in a Location Where They Will Be Noticed By
the Owner.
For Alcove or Closet Installation, see section 10.
For Bathroom or Bedroom Installation, see section 11.
For Mobile or Manufactured Home see, section 9.
For side or bottom exhaust, see section 6.
2

Publicité

Table des Matières
loading

Table des Matières