Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

– 
Do not leave the packaging within reach of children.
Installation
Installation must be carried out by certified technicians. Incorrect installation could cause product
failure, a reduced performance or an increased noise level.
– 
The unit might have sharp edges; use gloves during installation/adjustment.
–  All clearances indicated in the manual must be respected in order to guarantee performance, and to
allow installation and maintenance. In case valve packages are to be installed, make sure that there
is enough room left.
–  Sound travels very easily through hard materials. Soft rubber material can be used to reduce
contact noise.
Device installation guidelines :
–  Wall unit: wall on which the device is installed must be perfectly flat and sturdy enough to carry the
device's weight and must not contain any pipes or electrical wires.
–  Do not insert objects into the supply and return air openings.
Starting :
Start-up and commissioning of the fancoil must be carried out by skilled staff, qualified to work on
this type of product. :
–  The unit is positioned correctly.
–  The supply and return pipes are properly connected and insulated.
–  The pipes are clean and air is removed.
–  The inclination of the unit towards the drain and the p-trap are correct.
–  The wiring connections are correct and properly tightened.
–  The supply voltage is correct.
Run the unit for minimal 3 hours and check for abnormalities.
2.  SYMBOLS
Danger
Danger: electrical hazard
Danger: sharp edges / components
Danger: hot surfaces
Danger: moving parts
Attention: important warning
Enviromental safeguard
JAGA NV | VERTIGA HYBRID | MANUEL | 29 NOVEMBER 2021, 11:15 | V.01
VDC - direct current
VAC - alternating current
EN
41

Publicité

Table des Matières
loading

Table des Matières