The unit might have sharp edges; use gloves during installation/adjustment.
–  all clearances indicated in the manual must be respected in order to guarantee performance, and to
allow installation and maintenance. In case valve packages are to be installed, make sure that there
is enough room left.
–  Sound travels very easily through hard materials. Soft rubber material can be used to reduce
contact noise.
–  With cooling: insulate the hydraulic pipes.
–  When the condensate drain pipes are being connected, the pipe system must be sufficiently
supported in order to prevent strain on the condensate drain tray.
Device installation guidelines:
–  Wall-/ceiling unit: wall/ceiling on which the device is installed must be perfectly flat and sturdy
enough to carry the device's weight and must not contain any pipes or electrical wires.
–  Do not insert objects into the supply and re t urn air ope nings.
Starting:
Start-up and commissioning of the fancoil must be carried out by skilled staff, qualified to work on
this type of product.
–  The unit is positioned correctly .
–  The supply and return pipes are properly connected and insulated.
–  The pipes are clean and air is removed.
–  The inclination of the unit towards the drain and the p-trap are correct.
–  The wiring connections are correct and properly tightened.
–  The supply voltage is correct.
2. SYMBOLS
Danger
Danger: electrical hazard
Danger: sharp edges / components
Danger: hot surfaces
Danger: moving parts
Attention: important warning
Enviromental safeguard
VDC - direct current
VAC - alternating current
JAGA N.V. | CLIMA CANAL H19 | MANUEL | 2021.02.23 | V.01
EN
53

Publicité

Table des Matières
loading

Table des Matières