Kohler Sterling 2200A Serie Guide D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Bridge Member
(Outside Area)
Inside
Area
(Toward
Shower)
Strike Post
Outside
Bridge Member
Area
(Outside Member)
5. Assemble the Door Framework
NOTE: The seal may be deformed from packaging. Immerse in warm water until its shape returns.
Cut the seal 1/4" (6 mm) longer than the bridge member.
With the inside area of the framework facing down and the bridge members facing each other, lay
the framework on an open work surface.
Secure the flange and the strike post to the bridge members with eight #8 x 1" pilot point screws.
6. Determine the Direction of the Door Swing
Determine whether the door will pivot to the right or left.
Make sure the path of the shower door will not be obstructed as it swings open.
NOTE: The illustrations and instructions in this guide are for right pivot installations. Left pivot
installations will be opposite of what is illustrated and described.
Sterling
Seal
Side
Flange
#8 x 1"
Pilot Point
Screw
Inside Area
(Toward
Shower)
Flange
Top View
Pivot Side Left
About
100˚ Swing
18-7/8"
(47.9 cm)
All following
illustrations will be
Pivot Side Right
installations.
7
Make sure the path of the
door wil not be obstructed
as it swings open.
Top View
Pivot Side Right
About 18-7/8"
(47.9 cm)
100˚ Swing
1034045-2-C

Publicité

Table des Matières
loading

Table des Matières