Pre-Installation; Tools Required - K2 Pumps SWW05002TPK Notice D'utilisation

Pompes de manutention solides et submersibles
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

17. Follow all local electrical and safety codes, along with the National Electrical Code (NEC). In addition, all
Occupational Safety and Health Administration (OSHA) guidelines must be followed.
18. The motor of this pump has a thermal protector that will trip if the motor becomes too hot. The protector will reset
itself once the motor cools down and an acceptable temperature has been reached. The pump may start
unexpectedly if it is plugged in.
19. Ensure the electrical power source is adequate for the requirements of the pump.
20. This pump is made of high-strength, corrosion-resistant materials. It will provide trouble-free service for a long time
when properly installed, maintained, and used. However, inadequate electrical power to the pump, dirt, or debris
may cause the pump to fail. Please carefully read the manual and follow the instructions regarding common pump
problems and remedies.

PRE-INSTALLATION

APPLICATION
Submersible sewage pumps are designed for pumping sewage, effluent, wastewater or flooded water with up to 2 inch
solids.
The pump is built with overload thermal protections and auto reset. The pump is equipped with a 10' 3-prong
grounding-type power cord and piggyback-style switch for automatic or manual operation. Ball bearings on motor shafts
never need lubrication.

TOOLS REQUIRED

Flathead
Screwdriver
Cable Ties
MATERIALS REQUIRED (NOT INCLUDED)
2'' ABS or PVC
Pipe
gate valve
For Professional Technical Support call 1-844-242-2475
Phillips
Screwdrive
Safety
Goggles
Thread Tape
ABS or PVC
Cement (to match
the pipe)
Channel
Locks
Tape
Measure
The valve fits 2 in. black,
galvanized and DWV
Sch. 40 pipe and will
pass a full 2 in. solid.
Pipe Wrench
Hacksaw
2" 90°
Elbow
3

Publicité

Table des Matières
loading

Table des Matières