Makita PM7650H Manuel D'instructions page 11

Masquer les pouces Voir aussi pour PM7650H:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
Assembling mist blower pipes
CAUTION:
• Before performing any work on the mist blower, always stop the engine and pull
the spark plug connectors off the spark plug.
• Always wear protective gloves!
• Start the mist blower only after having assembled it completely.
• Make sure that all the hose bands are tight after assembly.
NOTE:
• Make the band's bolt heads come outer side when you tighten them as illustrated.
1. Assemble the swivel pipe (1) with the flexible pipe (2).
Tighten them with the 76 mm diameter band (3).
2. Assemble the flexible pipe with the elbow (4) of the mist blower.
Tighten them with the 100 mm diameter band (5).
3. Assemble the straight pipe (6) with the swivel pipe (1).
Align the groove of the straight pipe with the projection on the swivel pipe, and
turn the straight pipe until it clicks.
NOTE:
• The straight pipe stated above means the following three pipes and can be
substituted depending on your work need.
– Straight pipe (long) (6)
– Straight pipe (short) (7)
– Bent top pipe (8)
Only one or combination of the above pipes is supplied as a standard equipment
with your mist blower, which may differ from country to country.
The remaining types of pipes may need to be obtained as optional accessories.
All manuals and user guides at all-guides.com
11
(2)
(3)
(4)
(5)
(1)
(6)
(7)
(1)
(6)
(8)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pm7650hg

Table des Matières