Installation Wiring Notes - Mitsubishi Electric a Serie Manuel

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 226
α
2 Simple Application Controllers
4.
Wiring
Note;
• Refer to chapter 9 when wiring the AL2-ASI-BD.
• Refer to chapter 11 when wiring the AL2-2DA.
• Refer to chapter 12 when wiring the AL2-2PT-ADP.
• Refer to chapter 13 when wiring the AL2-2TC-ADP.
4.1

Installation Wiring Notes

The wiring of
trained in the local and national electrical standards should perform all tasks associated
with the electrical wiring of the
performing any wiring operations.
• Input and output cables should not be run through the same multicore cable or share the
same wire.
• Do not lay input/output cables near high voltage power cables.
• Input and Output cable length must be less than 30m (98' 5").
Allow for voltage drop and noise interference with input/output lines used over an extended
distance. Please use wire that is properly sized for the current load.
The terminal will accept a 3 mm flathead screwdriver.
α
2 Series has been designed to be safe and easy. A technician or engineer
α
2 Series controllers. Turn OFF the Power before
Wiring 4
ENG-18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

A2 serie

Table des Matières